111 projects

2025

Use of surplus power from a 43 kWp PV system for water heating at a paper processing hall: circuit design, Unistream PLC, 16 proportional KYOTTO relays and 16 heating elements of 2.2 kW, with individual control on each phase.

SMS TEAM, s.r.o., Miloslav Mittasch
2025

Visualisation of the main 110/6 kV, 400 MVA substation with sectionalised double busbars and 32 bays: circuit design, measurement acquisition via Modbus/TCP servers, and visualisation, archiving and trending in SCADA Reliance.

ENE20 s.r.o.
2025

Design of a 50 + 48 kWp PV installation and inspection of the lightning protection system (LPS) for the primary school in Tlučná.

Obec Tlučná
2024

Standard LV diagrams: modification of existing LV compartment switchgear for remote meter reading over RS485.

ENE20 s.r.o.
2024

Chemical water treatment, 10 t/h: complete Unistream control of sand filters, anion and cation exchangers, and feedwater heating for a 40 t/h boiler; PC visualisation, email and SMS reporting, monitoring at seven workstations and mobile access through SCADA Reliance.

JIP – Papírny Větřní, a.s.
2024

LV connection for outdoor lighting at Žinkovy Castle.

Zámek Žinkovy
2023

PS4 refining line: 4 × 6 kV/250 kW and LV drives. New IRODEL bay equipment, instrumentation panels and process sensors, Delta V, LV switchboards and drives.

JIP – Papírny Větřní, a.s.
2023

PV systems of 5–50 kWp for houses, apartment buildings and agricultural halls, including lightning protection designs with separated or isolated systems using HVI conductors.

celá Česká republika
2023

Cable sizing and protection calculations for a new LV switchroom at the Sahm s.r.o. glassworks.

Heřmanova Huť
2022

Modification of pneumatic paper transport using Höckner design inputs: power connections from newly equipped 200 A and 125 A bays, lighting and interconnections between process units.

Mondi Bupak s.r.o.
2022

Mitsubishi line based on manufacturer design inputs: supply from newly equipped 600 A and 200 A bays, new power distribution board, hall lighting and IT cabling.

Mondi Bupak s.r.o.
2022

Measurement of optimum transmission ratios and turbine speeds at small hydropower plants.

celá Česká republika
2021

Masterline 1 hall lighting: 44 SALUKA-LED ceiling fixtures, lighting calculations and wiring; three-phase supply with residual-current protection and sectional circuits for fault maintenance.

Mondi Bupak s.r.o.
2021

PSN separator, 55 kW: new outgoing feeder in the existing LV switchboard and Delta V integration.

JIP – Papírny Větřní, a.s.
2021

Garage, workshop and store: lighting, sockets, heat pump, sectional garage door, CCTV and networking.

Manželé Siroví, Praha
2020

DS30 turboseparator, 110 kW LV: new five-section 1000 A LV switchboard, distribution wiring and Delta V integration.

JIP – Papírny Větřní, a.s.
2020

PS6 refining line: 2 × 6 kV/500 kW, 2 × 6 kV/250 kW and LV drives. New MV bay equipment and 6 kV distribution, instrumentation panels, process sensors, Delta V, LV switchboards and drives.

JIP – Papírny Větřní, a.s.
2020

Almig compressor, 250 kW LV: feeder bay and switchboard for the compressor, air dryer and instrumentation; modifications to the Unitronics control panel, Reliance integration and software for V260 and Reliance 4.

ENE20 s.r.o.
2019

LV process power distribution, sockets and lighting at the České Budějovice planetarium.

Baukonstrukt Chromý s.r.o.
2019

New 250 A LV distribution board for Mondi Bupak's cardboard plant in České Budějovice.

H.S.E. s.r.o.
2019

Starch preparation plant and silo: external connections in cooperation with SRP Europe, Netherlands.

Mondi Bupak s.r.o.
2018

Malechov small hydropower plant, 37 kW: electrical design and software for a refurbished plant on the Úhlava; UNITRONICS OPLC Vision 560, automatic operation, SMS reporting, alarms and control, and operating statistics.

Ing. Milan Kovařík
2018

Voith mill, 6 kV, 200 kW: MV, LV and instrumentation systems; refurbishment of an IRODEL 6 kV bay, MV circuit-breaker retrofit, MiCOM P220 protection and Delta V integration.

JIP – Papírny Větřní, a.s.
2018

Extension of halls 4–7: electrical installation and process equipment for a pig-finishing facility.

Integraz, spol s r.o.
2017

Measurement of optimum transmission ratios and turbine speeds at small hydropower plants.

MVE do 50 kW, celá Česká republika
2017

Development and technical support of the 4riders.cz online shop.

4RIDERS
2017

Servicing of MiCOM 22 kV overcurrent protection and short-circuit calculations coordinated with the E.ON distribution network.

MONDI BUPAK s.r.o., České Budějovice
2016

Plav water treatment plant, 22 kV switchgear: revenue metering in bays 02 and 09.

Jihočeský vodárenský svaz, Č. Budějovice
2016

Modernisation of a piglet production facility, SO01–SO05: electrical systems.

Integraz spol. s r.o., Vrbice
2016

Electrical installation at Přestavlky 13: conversion of a farm building into a house with five distribution boards.

Manželé Siroví, Chlumčany
2015

Dašice small hydropower plant, 90 kW: design, software and installation. Following Ing. Čižinský's 2010 overhaul, a monitoring system, remote control and SMS monitoring were added. Three-phase UPS for sluice-gate operation during power outages; Vision 560.

MVE Dašice p. Tomáš Klásek
2015

STTEN production halls in Čkyně: planning-permission design for three rubber-seal processing halls, supplied from the LV grid with an expected demand of around 200 kW.

STTEN s.r.o. Dr. Jan Šťastný, MBA
2015

Measurement of optimum water-turbine speeds and transmission ratios in the Czech Republic. The equipment includes input and output RLC filters, so its roughly 300 kg weight also helps protect the plant being tested.

MVE do 50 kW Celá Česká republika
2014

Gas CHP units of 9–37 kW for KOGET, s.r.o.: unit design, UNITRONICS OPLC control software and boiler-house design for planning approval; maximising the use of generated electricity.

KOGET s.r.o. Ing. Tomáš Jalůvka
2014

Instrumentation and control of the MELILOO thermohydraulic loop for experimental removal of corrosion products from liquid metal within ITER. Pb-17Li is used in the TBM to transport tritium to the separation unit. Vision 560 with twelve I/O modules and PC control via SCADA Reliance 4.

Ústav jaderného výzkumu, a.s. Ing. Lukáš Košek
2013

Francis hydropower plant, 300 kW: generation metering under Czech Decree 82/2011, design of a 6 kV, 50 A metering bay and auxiliary consumption calculation.

Jihočeský vodárenský svaz Č. Budějovice
2013

Kamberk small hydropower plant, 15 kW: complete design and software for a former mill; UNITRONICS OPLC Vision 260, automatic operation, SMS reporting, alarms and control, and operating statistics.

Ing. Jan Jakab Kamberk
2013

16 kW heat pump: supplier selection in China, purchase and installation arrangements; complete design and installation including a variable-frequency drive to maximise use of rooftop PV generation.

Rodinné domy Jižní Čechy
2013

Earthing refurbishment for a high-voltage test facility, 600 kV/30 kJ: design meeting strict earthing resistance and interference requirements.

EGE spol s r.o. Č. Budějovice 2014
2012

“Bubnárna STTEN”: as-built documentation for a production hall with imported O-ring processing equipment, environmental classification and occupancy approval.

STTEN s.r.o. Vimperk
2012

RICE – Regional Innovation Centre for Electrical Engineering: tender documentation based on the bill of quantities for LV and MV power switchgear in the drive laboratory hall.

Západočeská univerzita Plzeň
2012

Technical assessment of MV and LV systems at TS2 following a failure of switchboard RH5; analysis of possible causes and proposed corrective measures.

JohnsonControls Autobaterie spol. s r.o. Česká Lípa
2011

Operating procedures for backup power at the water treatment plant: start-up and shutdown instructions and on-site testing.

Jihočeský vodárenský svaz Č. Budějovice
2011

Assessment records of external influences at a cardboard plant, including potentially explosive areas.

Smurfit Kappa Žebrák
2011

Replacement of 22 kV substation protection using MiCOM P122: complete design, settings calculations, commissioning and protection testing.

Duropack, Bupak Papírna s.r.o. Č. Budějovice
2010

Small rooftop PV systems for houses: UNITRONICS PLC with an electric water heater or swimming pool to improve the owner's financial benefit by limiting grid export.

Rodinné domy Jižní Čechy
2010

Design for a beverage-carton processing line dismantled in Norway: 1600 kVA supply, drives, instrumentation and Delta V integration with 700 I/O.

JIP-Papírny Větřní, a.s.
2010

Periodic testing of 22 kV MiCOM P122 protection relays and addition of functions.

Duropack-Bupak Papírna s.r.o. Č. Budějovice
2009

Backup power for Plav water treatment plant: design concept, short-circuit calculations, feasibility study, tender documents, MV switchgear extension and 6 kV/1600 kVA and 0.4 kV/700 kVA diesel generators.

JVS České Budějovice 2009
2009

Small rooftop PV systems for houses: independent inverter and panel design, surge and lightning protection assessment and design; UNITRONICS PLC and electric water heater to improve the financial benefit for the owner.

Rodinné domy Jižní Čechy
2008

Restoration of Mazanec small hydropower plant in a former hammer mill: complete design and software, UNITRONICS OPLC Vision 260, automatic operation, SMS reports and alarms, and operating statistics.

Jiří Mazanec Český Krumlov
2008

PS7 refining line: instrumentation and control design for process equipment, connected to the local Delta V system.

JIP-Papírny Větřní, a.s.
2008

Replacement of the protection panel at the main 22 kV substation using MiCOM P122 relays: complete design, settings calculations, commissioning and protection testing.

Duropack, Bupak Papírna s.r.o. Č. Budějovice
2007

Visualisation of gas boiler K3 (40 t/h, 1.2 MPa), control of steam pressure-reducing station RS3 (40 t/h, 1.2/0.3 MPa), visualisation at eleven energy workstations and SMS alarms; Vision 260, OPC server and Reliance3.

UNITHERM s.r.o. Jablonec nad Nisou
2007

Electrical distribution documentation and short-circuit calculations for 165 nodes in a 22 and 6 kV network to ČSN EN 60909-0; protection settings and selectivity concept.

Duropack, Bupak Papírna s.r.o. Č. Budějovice
2007

PS7 refining line: two 6 kV, 500 kW motors; construction and retrofit of ABB SR-VF (IRONG) MV switchgear and refurbishment of a 6 kV bay.

JIP-Papírny Větřní, a.s.
2006

Electrical installation of a steam heat exchanger for administration and maintenance buildings; UNITRONICS OPLC Vision 260 control, OPC server and Reliance3 visualisation.

JIP-Papírny Větřní, a.s.
2006

E.ON, Větřní 110 kV substation: key-interlocked disconnectors for arc-suppression coils.

E.ON Česká republika, a.s. Č. Budějovice
2006

Waterworks switchgear: LV and MV drives, coarse screens, vacuum filters and 630 kW MV pumps; UNITRONICS OPLC Vision 260, CANbus, OPC server and Reliance 3; pump control and standby changeover.

Elektro Štindl Větřní
2005

Husinec small hydropower plant: OPLC-M91 control, PC modem communication over GSM and landline, SMS reporting.

Sdružení SZS
2005

Energy department control system: OPLC-M91, Vision260, CANbus, OPC server and Reliance3 visualisation; control of pressure-reducing stations, a 15 MVA steam turbine, waterworks and neutralisation.

JIP-Papírny Větřní, a.s.
2005

Paper processing: new production-hall electrical installation for paper processing equipment.

SMS Team, s.r.o. Chvalšiny
2004

JČE, Mydlovary 110 kV substation: key-interlocked disconnectors for arc-suppression coils.

JČE, a.s. Č. Budějovice
2004

Písek heating plant: refurbishment of all incoming LV power switchboards.

Inprelog, s.r.o. Č. Budějovice
2004

TP Písek, Samoty heating plant: LV switchboard refurbishment and preparation of control-system connections. Inprelog, s.r.o., České Budějovice.

Z praxe před založením firmy
2003

6 kV power factor correction, 2 × 5148 kVAr.

Kompel, s.r.o. Brno
2003

Frantschach Energo: replacement of enclosed 6 kV, 4000 A busbars for T1 and T2 (110/6 kV, 40 MVA) and TG4 (6 kV, 40 MVA).

ERCOM, s.r.o. Štětí
2003

Electric heating of outdoor debarking conveyors, equipment sheds and auxiliary facilities; U-M91 PLC control networked via modems and CANbus.

JIP-Papírny Větřní, a.s.
2002

Central compressed-air station at the TPCA car plant in Kolín, using a SIEMENS solution.

SIEMENS, s.r.o. Praha
2002

Frantschach Energo: surge protection for VM1 6 kV circuit breakers.

ERCOM, s.r.o. Štětí
2002

Husinec small hydropower plant: new switchboard and Schneider TSX07 PLC control system.

Sdružení SZS
2001

Plav water treatment plant: new 22 kV and 6 kV switchgear, an integrated design using partially enclosed SIEMENS SF6 technology.

SIEMENS, s.r.o. Praha
2001

ZČE, Škoda Plzeň main 22 kV substation: enclosed ALSTOM SF6 switchgear.

ALSTOM CZECH, s.r.o.
2001

Grinder No. 8, 6 kV, 1800 kW induction motor: MV and LV systems.

JIP-Papírny Větřní, a.s.
2000

Plant network short-circuit calculations – 743 nodes in the 6 kV network.

ABB-Energo s.r.o. Praha
2000

R1 substation, 110/6 kV, 2 × 40 MVA: 6 kV systems and building fault signalling.

ABB-Energo s.r.o. Praha
2000

Grinder No. 5, 6 kV, 1800 kW induction motor: MV and LV systems.

JIP-Papírny Větřní, a.s.
1999

JČE, České Budějovice Střed 22 kV substation: power and LV systems, cable diversions; enclosed ALSTOM SF6 switchgear.

Inprelog, s.r.o. Č. Budějovice
1999

22 kV supply to the wastewater treatment plant.

JIP-Papírny Větřní, a.s.
1999

Supercalender No. 2, 6 kV drive.

JIP-Papírny Větřní, a.s.
1998

Renewed occupancy approval for paper processing premises and lighting refurbishment to Czech standards.

JIP-Papírny Větřní, a.s.
1998

Grinder plant extension: LV systems, artificial lighting and lightning protection.

PIK-JIP, s.r.o. Č. Budějovice
1998

Forced cooling for transformer T2, 22/6 kV, 8 MVA – PLC control.

Energetické strojírny Brno, a.s.
1997

Šebelův mlýn small hydropower plant: electrical installation and PLC control.

Sdružení SZS
1997

Stone-cutting machining centre: electrical documentation and PLC control.

Diamant Servis sro. Nový Rychnov
1997

Grinder No. 2, 6 kV, 1350 kW synchronous motor: MV and LV electrical systems.

JIP-Papírny Větřní, a.s.
1996

Electrical and instrumentation design for the BTG steam pressure-reducing station, 40 t/h.

EZ Praha, a.s.
1996

PS7 paper machine refurbishment: electrical installation of the Jagenberg rewinder, VIB steam box, lighting and internal power distribution.

Chemoprojekt, a.s. Praha
1996

MV blower M6.3, 250 kW.

JIP-Papírny Větřní, a.s.
1995

Speed control for feedwater pump No. 2.

JNS, s.r.o. Paskov
1995

K1 visualisation and a VB application for the TDC3000 data transfer protocol.

Honeywell, s.r.o. Praha
1995

Central power factor correction at the 22 kV substation, Plav water treatment plant.

JIVAK, a.s. Č. Budějovice
1995

Starting system for pump M201, 6 kV, 1250 kW.

JIVAK, a.s. Č. Budějovice
1994

Electrical demand profile control: documentation, software algorithms and installation management.

Z praxe před založením firmy
1994

Minor distribution system modifications – RM 330, RM 150, RO 3c.

Z praxe před založením firmy
1994

Refurbishment of condensate stations: turbine hall, K1 and old boiler house.

Z praxe před založením firmy
1994

Instrumentation and control for gas boiler K1.

Honeywell, s.r.o. Praha
1993

MV feedwater pumps – three 6 kV, 630 kW motors, twelve electrically operated valves and standby changeover: documentation and installation management.

Z praxe před založením firmy
1993

22 kV plant power supply – two 22 kV, 1000 A switchgear bays: documentation and installation management.

Z praxe před založením firmy
1992

Speed control of a waterworks pump – 6 kV, 630 kW, subsynchronous cascade and standby pump changeover: documentation and installation management.

Z praxe před založením firmy
1992

Standby arrangements for three ash-slurry pump sets with automatic level control and changeover: documentation and installation management.

Z praxe před založením firmy
1991

Manual boiler-house drive control independent of the computer: documentation and installation management.

Z praxe před založením firmy
1991

Automatic de-ashing of boiler K12 – conveyors with timed sequences, sensors and a slag lift: documentation and installation management.

Z praxe před založením firmy
1990

Renewal of electricity metering at JIP Větřní with PC processing – around 700 meters, consumption and measurement accuracy assessment by department: documentation, software and implementation.

Z praxe před založením firmy
1989

Computer control of a boiler house (two 75 t/h, 6.4 MPa boilers): power systems, instrumentation and control interfaces and process sequences; documentation and installation management.

Z praxe před založením firmy
1988

Pulping equipment connection – 6 kV, 250 kW motor: MV design documentation and MV installation management.

Z praxe před založením firmy
1988

Automatic fly-ash pumping control – two 150 kW W-E motors and valves: documentation and electrical installation management.

Z praxe před založením firmy
1988

Refurbishment of the grinder substation and addition of groundwood pumps – five 6 kV, 1350 kW synchronous motors and two 250 kW induction motors: documentation and installation management.

Z praxe před založením firmy
1987

Computer centre power supply – 100 kVA transformer, 6000/220 V, separation of supply circuits: documentation and installation management.

Z praxe před založením firmy
1986

Central power factor correction at the main substation – 6 kV, 3 MVAr: documentation and electrical installation management.

Z praxe před založením firmy
1985

Installation of TG 1 generator – 6 kV, 15 MVA: electrical documentation and installation management.

Z praxe před založením firmy